SKKL Sabang-Lhokseumawe-Medan

SGI was entrusted by PT Infrastruktur Telekomunikasi Indonesia (Telkom Infra), a subsidiary of PT Telekomunikasi Indonesia Tbk, to carry out the deployment of Sea-Cable Communication System (SKKL) Sabang – Lhokseumawe – Medan (SLM) which was successfully completed in May 2019 by using cable ship Teliri and Pacific Guardian.
The total length of the deployed submarine cables are:
Sabang – Lhokseumawe (238km)
Lhokseumawe – Medan (333km)

Our scope of works are as follows:

  • Supply and installation of OSP FO terrestrial cable in Lhokseumawe area
  • (3km)
  • BMH construction

  • PLGR works

  • Main lay works (buried & surface lay)
  • ,
  • including pipe lines and cable crossings

  • PLI and PLB works